检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邢旭亮 王京 周刚 卢天白 XING Xuliang;WANG Jing;ZHOU Gang;LU Tianbai(Jiaxing Power Supply Company,Zhejiang Jiaxing 314000,China;Nuclear Power Operation and Management Co.,Ltd,Zhejiang Jiaxing 314000,China)
机构地区:[1]国网浙江省电力有限公司嘉兴供电公司,浙江嘉兴314000 [2]中核核电运行管理有限公司,浙江嘉兴314000
出 处:《农村电气化》2023年第1期91-92,95,共3页Rural Electrification
摘 要:分析了一起500 kV变电站流变接头发热异常事件,通过运维管控、机器人测温、检修计划管理等手段,对流变接头发热异常进行跟踪监视,最后通过合理利用停电计划,对故障进行处理。通过该异常事件,提出了4项改进措施,科学合理地提高变电站设备的缺陷处理和检修策略能力。An abnormal heating event of rheological joint in 500 kV substation is analyzed. Through operation and maintenance control, robot temperature measurement, maintenance plan management and other means, the abnormal heating of rheological joints is tracked and monitored. Finally, the failure is dealt with by making rational use of the outage plan. Through this abnormal event, four improvement measures are proposed, which scientifically and reasonably improve the ability of defect handling and maintenance strategy of substation equipment.
分 类 号:TM761[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.185.96