大藤峡水利枢纽库区七星河泵站规模分析  被引量:1

Analysis on the Scale of Qixing River Pump Station in Datengxia Water Project

在线阅读下载全文

作  者:樊红霞[1] 尹开霞[1] 姜紫萍 FAN Hong-xia;YIN Kai-xia;JIANG Zi-ping(China Water Resources Pearl River Planning Survey&Design Co.Ltd.,Guangzhou 510610,China;College of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210098,China)

机构地区:[1]中水珠江规划勘测设计有限公司,广州510610 [2]河海大学水利水电学院,南京210098

出  处:《水利科技与经济》2023年第1期102-105,110,共5页Water Conservancy Science and Technology and Economy

摘  要:通过分析大藤峡库区武宣县城区防洪排涝、七星河消落带治理等需求,综合考虑大藤峡水库运行方式,确定城区防洪排涝总体布局。七星河泵站是武宣县城七星河防护体系的一部分,为确定七星河泵站规模,根据大藤峡水利枢纽运行方式和干支流洪水遭遇情况,分析确定其抽排设计工况为主汛期干流20年一遇洪水遭遇支流2年一遇洪水,研究成果可为库区泵闸规模分析提供参考。By analyzing the needs of flood control and drainage in Wuxuan county, Qixing river fluctuation zone, and considering the operation mode of Datengxia reservoir, the overall layout of flood control and drainage is determined.According to the operation mode of Datengxia water project and the analysis of flood encounters of main stream and tributaries, the design condition of pumping and drainage is determined.As a result, the main stream meets the flood every 20 years and the tributaries meet the flood every 2 years in the major flood period, and the scale of Qixinghe pump station is determined.

关 键 词:泵站规模 设计工况 大藤峡 

分 类 号:TV675[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象