检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘晓飞 赵中毫 LIU Xiaofei;ZHAO Zhonghao(Guangxi Fangchenggang Nuclear Power Co.,Ltd.,Fangchenggang 538001)
机构地区:[1]广西防城港核电有限公司,广西防城港538001
出 处:《电力安全技术》2022年第12期5-7,10,共4页Electric Safety Technology
摘 要:针对核电机组大修期间防异物管理的难题,从项目管理知识体系出发,按照准备阶段的预防、实施阶段的控制以及总结阶段的反馈,对防异物管理的措施及方法进行探讨,优化大修防异物控制措施,进一步提升安全管理水平。In allusion to the difficulties of foreign matter prevention management during the overhauls of nuclear power units, starting from the project management body of knowledge, according to the requirements of prevention for the preparation stage, control for the implementation stage and feedbacks for the summary stage,the measures and methods for foreign matter prevention management are discussed, and the control measures for foreign matter prevention during overhaul are optimized to further improve the safety management level.
关 键 词:核电大修 防异物 生命周期管理 项目管理知识体系
分 类 号:TM08[电气工程—电工理论与新技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7