T/R组件电老练测试系统设计  被引量:2

Design of T/R Component Electric Aging Test System

在线阅读下载全文

作  者:贾守波 吴文超 王博 陈一凡 王淑秀 徐立航 JIA Shou-bo;WU Wen-chao;WANG Bo;CHEN Yi-fan;WANG Shu-xiu;XU Li-hang(Shanghai Radio Equipment Research Institute,Shanghai 201108,China;Shanghai Shentian Industrial Co.,Ltd.,Shanghai 200090,China)

机构地区:[1]上海无线电设备研究所,上海201108 [2]上海神添实业有限公司,上海200090

出  处:《测控技术》2023年第1期62-69,共8页Measurement & Control Technology

基  金:上海市高端智能装备首台突破专项(ZB-ZBST-01-20-0090)。

摘  要:T/R组件电老练测试系统主要用于T/R组件的研制和生产。针对T/R组件电老练测试过程中工作量大、耗时长的问题,提出了一种可批量电老练的组合式T/R组件电老练测试系统解决方案,对电老练测试系统进行了开发验证。设备为组合机柜式结构,功能上分为电老练单元区、电源仪表区和人机交互区,可实现T/R组件在预设条件(供电、射频、脉冲和温度等)下规定时长的电老练测试。测试软件是基于自适应调节控制算法的并行测试技术实现电老练自动测试管理,并基于IVI技术进行仪器仪表的控制接口封装,实现24通道T/R组件产品老练过程中的实时数据采集、处理、显示、存储功能。系统采用模块化结构,可根据需要灵活配置;软件平台界面接口丰富、开放程度高,具备良好的维护性和拓展性。实际应用表明此系统满足T/R组件电老练测试各项指标要求;与传统方法相比,自动化程度高,能够较大程度地提高T/R组件电老练测试效率,具备较强的实用性。The T/R component electrical burn-in test system is mainly used for the development and production of T/R components.Aiming at the problem of heavy workload and long time-consuming T/R component electrical burn-in test process, a combined T/R module electrical burn-in test system solution that can be batch-type electrical burn-in is proposed to verify the electrical burn-in test system.The equipment is a combined cabinet structure, which is functionally divided into electrical burn-in unit area, power meter area and human-computer interaction area, which can realize T/R components electricalburn-in testfor a specified period of time under preset conditions(i.e.power supply, radio frequency, pulse, temperature, etc.).The test software realizes electrical burn-in automatic test management based on the parallel test technology of adaptive adjustment control algorithm, and packages the control interface of instrumentation based on IVI technology, so as to realize the real-time data collection, processing, display and storage functions in the process of 24-channel T/R component productsburn-in.The system adopts a modular structure and can be flexibly configured according to needs.The software platform has rich interface interfaces, a high degree of openness, and has good maintainability and expandability.Practical application shows that this system meets the requirements of various indicators of T/R module electrical burn-in test.Compared with traditional methods, it has a higher degree of automation, can greatly improve the efficiency of T/R module electrical burn-in test, and has strong practicability.

关 键 词:T/R组件 并行测试 IVI技术 接口封装 电老练测试 

分 类 号:TP274.5[自动化与计算机技术—检测技术与自动化装置] TP249[自动化与计算机技术—控制科学与工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象