检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李艳娜 孔宇田 王坤 周洲 余扬 LI Yan-na;KONG Yu-tian;WANG Kun;ZHOU Zhou;YU Yang(Guizhou Equipment Manufacturing Polytechnic,Guiyang 551400,China;Power China Guiyang Engineering Corporation Limited,Guiyang 550081,China)
机构地区:[1]贵州装备制造职业学院,贵州贵阳551400 [2]中国电建集团贵阳勘测设计研究院有限公司,贵州贵阳550081
出 处:《云南水力发电》2023年第1期116-120,共5页Yunnan Water Power
摘 要:结合BSG水电站枢纽布置及地形地质条件拟定上、下两个厂址,主要从水能利用、引水系统建筑物布置、发电厂房布置、地质条件、施工组织、投资6个方面对BSG水电站厂房位置进行了经济技术比较。选定上厂址为推荐厂房位置方案。Two upper and lower plant sites are proposed in combination with layout of BSG hydropower station complex and topographic and geological conditions. This paper mainly compares the location of BSG hydropower plant from six aspects: utilization of water energy, layout of structures in water diversion system, layout of power house, geological conditions, construction organization and investment. The upper plant site is selected as the recommended plant location scheme.
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.119.156