检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李斌 何宝华 李宏波 朱立刚[2] 邹金林[2] 孙强 LI Bin;HE Baohua;LI Hongbo;ZHU Ligang;ZOU Jinlin;SUN Qiang(Zhubo Design Co.,Ltd.,Shenzhen 518035,China;Arup Engineering Consulting(Shanghai)Co.,Ltd.,Shanghai 200031,China;Tishman Speyer Investment Consulting(Shanghai)Co.,Ltd.,Shanghai 200041,China)
机构地区:[1]筑博设计股份有限公司,深圳518035 [2]奥雅纳工程咨询(上海)有限公司,上海200031 [3]铁狮门投资咨询(上海)有限公司,上海200041
出 处:《建筑结构》2023年第3期133-137,151,共6页Building Structure
摘 要:联想后海大厦位于深圳后海中心区,两栋塔楼在高区悬挑转换,均采用框架-核心筒(带高位转换)结构体系,对基础沉降极为敏感。项目所在场地基岩面较深,大部分区域中风化岩埋深超过120m,超高层建筑采用嵌岩桩施工困难。项目结合后海地区其他项目经验,最终选用桩端及桩侧均后注浆的灌注桩技术,以强风化岩为桩基础持力层。通过在承压及抗拔试验桩上对应位置设置压力应变片,静载试验分级加载时同步读取应变数据并推算不同桩身处的应力,分析后海地区桩侧不同土层及桩端持力层在后注浆施工工艺下对应的土层后注浆增强系数与规范建议值的差异,最终确定后注浆端阻及侧阻参数,优化了承压及抗拔桩,节约造价并缩短工期。Lenovo Houhai Building is located in the central area of Houhai, Shenzhen. The two towers extend and transfer in the high area, and both of them adopt the frame-core tube with high level transfer structure system, which is extremely sensitive to the foundation settlement. The bedrock surface of the project site is deep, and the buried depth of moderately weathered rock in most areas is more than 120m. Under such situation, it is extremely difficult to adopt rock-socketed piles for super high-rise building. Combined with the experience of other projects in Houhai area, the project finally selects the cast-in-place pile technology of post grouting at the pile end and pile side, and take the moderately weathered rock as the pile foundation bearing stratum. By setting pressure strain gauges on the corresponding positions of the bearing and uplift test piles, synchronously reading the strain stress data and calculating the stresses of different piles during the static load test stage loading, the difference between the corresponding soil layer post grouting actual improvement coefficients and the recommended values in the code under the post grouting construction technology of different soil layers at the pile side and also pile end bearing layers in Houhai area was analyzed. Finally, the post grouting end resistance and side resistance parameters were determined, the bearing and uplift piles were optimized, the cost was saved and the construction period was shortened.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229