检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘晓冬 Liu Xiao-dong
机构地区:[1]上海东捷建设(集团)有限公司,上海200120
出 处:《电力系统装备》2022年第12期29-31,共3页Electric Power System Equipment
摘 要:近些年,随着时代的进步,科技水平的提升,使得我国城市化进程在原有发展水平上持续迈进,在此大背景下我国城市轨道交通发展速度日益提升。通过对其供电系统展开了解可以发现,其中必不可少的配件便是电缆头,电缆头的作用和重要性对于整个轨道交通运行来讲必不可少。文章将聚焦于郑州市,对该区域的轨道交通2号线一期工程供电系统工程进行分析,对工程中35 kV高压电缆头相关制作工艺和质量控制重点展开描述。In recent years,due to the progress of the times and the improvement of scientific and technological level,China’s urbanization development process has continued to move forward at the original level.Under this background,the development speed of China’s urban rail transit has been increasing.Through the understanding of the power supply system,it can be found that the essential accessory is the cable head,which is also widely used in the current rail transit power system.The role and importance of the cable head are essential for the entire rail transit operation.In this writing process,the author will focus on Zhengzhou,and make a detailed analysis on the power supply system project of Rail Transit Line 2 phase I project in this area.Based on this premise,the author will describe the key control points of 35 kV high-voltage cable head in this project.The author hopes that the content of this paper can play a certain reference role for relevant personnel to carry out their work.
分 类 号:U223.6[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222