检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汤联生 刘霖 周保中 吴思翰 刘谧 Tang Lian-sheng;Liu Lin;Zhou Bao-zhong;Wu Si-han;Liu Mi
机构地区:[1]福建华电可门发电有限公司,福建福州350512 [2]华电电力科学研究院有限公司,浙江杭州310012
出 处:《电力系统装备》2022年第12期170-172,共3页Electric Power System Equipment
摘 要:电力系统可再生能源高渗透率背景下,容量成本回收机制是促进电力市场平稳运行,稳定发电机组收益,保障电力系统充裕度的重要举措。文章首先介绍了国外典型电力市场容量成本回收机制,并对典型机制的适用性进行了分析。然后针对适合我国电力市场现阶段容量成本补偿机制的实施方式进行了介绍。最后,对我国容量成本回收机制建设提出了相关建议。Under the background of high penetration rate of renewable energy in the power system,the capacity cost recovery mechanism is an important measure to promote the smooth operation of the power market,stabilize the income of generator sets,and ensure the adequacy of the power system.This paper firstly introduces the capacity cost recovery mechanism of a typical foreign electricity market,and analyzes the applicability of the typical mechanism.Then,the implementation mode of the capacity cost compensation mechanism suitable for the current stage of my country’s electricity market is introduced.Finally,some suggestions are put forward for the construction of my country’s capacity cost recovery mechanism.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70