检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄宜伟 HUANG Yiwei(China Railway No.5 Bureau Group Mechanization Engineering Co.,Ltd.,Hengyang,Hunan 421000)
机构地区:[1]中铁五局集团机械化工程有限责任公司,湖南衡阳421000
出 处:《工程技术研究》2022年第23期51-53,共3页Engineering and Technological Research
摘 要:在我国东南沿海地区,分布着海相冲淤软土,在这些地区修建公路、铁路等基础设施,软基处理是面临的首要难题。软基施工对周边地表及房屋干扰较大,特别是在城市建设中,容易发生地表隆起、房屋开裂、倾斜等现象。文章提出一种预钻孔预应力管桩施工技术,通过长螺旋钻孔抽提淤泥,后采用静压机压桩,这样既能对淤泥质软土进行深层加固,又能减少对周边的扰动,成桩后通过试验检测,承载力满足设计要求。In the southeast coastal areas of China,there are marine alluvial soft soil.To build roads,railways and other infrastructure in these areas,soft foundation treatment is the primary problem.Soft foundation construction has great interference to the surrounding surface and houses.Especially in urban construction,it is easy to cause surface uplift,house cracking and tilt.In this paper,a pre-bored prestressed pipe pile construction technology is proposed.The silt is extracted by long spiral drilling,and then the static pressure machine is used to press the piles.In this way,the deep reinforcement of alluvial soft soil can be carried out,and the disturbance to the surrounding areas can be reduced.After the pile is formed,the bearing capacity meets the design requirements through the test and detection.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.173.228