检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:董静祎 朱晓章 王舸 DONG Jing-yi;ZHU Xiao-zhang;WANG Ge(Central&Southern China Municipal Engineering Design and Research Institute Co.,Ltd.,Wuhan,Hubei,430070,China)
机构地区:[1]中国市政工程中南设计研究总院有限公司,湖北武汉430070
出 处:《建材技术与应用》2023年第1期30-32,共3页Research and Application of Building Materials
摘 要:现有污水处理厂仍存在多种缺陷,其中以污泥浓缩池为代表的敞口污水处理构筑物气体污染问题尤为突出。张拉膜结构体系以其自身优点在污水处理厂加盖工程中得到广泛应用。结合某污水处理厂污泥浓缩池的加盖工程,复核张拉膜加盖后,原池体结构的截面、配筋及对已建水池结构安全的影响。There are many defects in existing sewage treatment plants,especially the gas pollution of open sewage treatment structures represented by sludge enrichment ponds.Tensioned membrane structure system has been widely used in sewage treatment plant capping project for its own advantages.Tensioned membrane structure system has been widely used in sewage treatment plant capping project for its own advantages.Combined with the capping project of sludge enrichment pool in a sewage treatment plant,the section and reinforcement of the original pool structure and its influence on the safety of the existing pool structure were reviewed after the tensioning membrane was covered.
关 键 词:污水处理厂 污泥浓缩池 张拉膜 有限元 配筋复核
分 类 号:X512[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.221.185