医院既有建筑局部结构加固实施难点及应对措施  被引量:1

Difficulties and Countermeasures of Local Structural Reinforcement of Existing Buildings in Hospitals

在线阅读下载全文

作  者:张文捷 李欢 刘志君 ZHANG Wenjie;LI Huan;LIU Zhijun

机构地区:[1]扬州大学附属医院,扬州225001

出  处:《中国医院建筑与装备》2022年第12期71-73,共3页Chinese Hospital Architecture & Equipment

摘  要:以扬州大学附属医院医技楼二层核磁共振室结构加固为例,总结了医院既有建筑局部结构加固项目的特点,通过多方案对比确定了结构加固方案,分析了项目实施过程中的难点,并提出了解决方案。Taking the structural reinforcement of the MRI room on the second floor of the Medical Technology Building of the Affiliated Hospital of Yangzhou University as an example,the characteristics of the local structural reinforcement project of the existing building of the hospital are summarized,through the comparison of multiple schemes,the structural reinforcement scheme is determined,the difficulties in the project implementation process are analyzed,and solutions are proposed.

关 键 词:医院建筑 结构加固 核磁共振室 

分 类 号:TU246.1[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象