19 m特厚煤层孤岛综放面小煤柱沿空巷道煤柱宽度选择及工程应用  被引量:4

Width selection and engineering application of small coal pillar goaf roadway in island fully mechanized caving face of 19 m extra-thick coal seam

在线阅读下载全文

作  者:田伟鹏 崔佐军 范小龙 TIAN Weipeng;CUI Zuojun;FAN Xiaolong(Zuoyun Donggucheng Coal Industry Co.,Ltd.,Shanxi Coal Import&Export Group,Datong 037100,China)

机构地区:[1]山西煤炭进出口集团左云东古城煤业有限公司,山西大同037100

出  处:《中国矿业》2023年第2期112-119,共8页China Mining Magazine

摘  要:为研究19 m特厚煤层孤岛综放工作面小煤柱沿空巷道煤柱合理宽度,以东古城煤业Z109工作面为研究对象,采用极限平衡理论经验公式,计算得到沿空巷道合理煤柱宽度理论值为7.7~9.1 m;采用FLAC^(3D)软件建立了不同煤柱宽度的数值计算模型,分析了孤岛工作面围岩应力分布规律以及不同煤柱宽度条件下掘巷和工作面回采阶段沿空巷道围岩及煤柱破坏特征,确定了煤柱合理宽度为8 m;通过现场实测,得到了掘巷及回采期间巷道围岩变形量,实测结果表明巷道围岩变形得到有效控制,护巷煤柱留设宽度选择较为合理。本文研究成果对于指导特厚煤层孤岛综放面小煤柱沿空巷道合理煤柱宽度选择具有一定的理论意义与工程意义。In order to study the reasonable width of small pillar gob side entry in the island fully mechanized top coal caving face of 19 m extra thick seam,taking Z109 working face of Donggucheng Coal industry as the research object,the theoretical value of reasonable coal pillar width of gob side entry is calculated as 7.7-9.1 m by using the empirical formula of limit equilibrium theory.FLAC 3D software is used to establish the numerical calculation model of different coal pillar widths.The stress distribution law of surrounding rock of island working face and the failure characteristics of surrounding rock and coal pillar of gob side entry in the driving and mining stages of working face under different coal pillar widths are analyzed,and the reasonable width of coal pillar is determined to be 8 m.Through field measurement,the deformation of surrounding rock during tunneling and mining is obtained.The measured results show that the deformation of surrounding rock is effectively controlled,and the coal pillar width is reasonably selected.The research results have certain theoretical and engineering significance for guiding the reasonable selection of pillar width in gob side entry of small coal pillar in island fully mechanized top coal caving face in extra thick coal seam.

关 键 词:特厚煤层 孤岛综放工作面 煤柱宽度 数值模拟 

分 类 号:TD822[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象