检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贾陈君 周杰[2] JIA Chen-jun;ZHOU Jie(China Railway Eryuan(North)Survey and Design Co.Ltd.,Ji'nan 250012,China;China Railway Major Bridge Reconnaissance&Design Institute Co.Ltd.,Wuhan 430034,China)
机构地区:[1]中铁二院北方勘察设计有限责任公司,济南250012 [2]中铁大桥勘测设计院集团有限公司,武汉430034
出 处:《工程建设与设计》2022年第23期83-85,共3页Construction & Design for Engineering
摘 要:受既有隧道净空条件、衬砌强度及限界等限制,电气化改造中的隧道工程设计方案往往是整个项目的重难点,也影响着整个工程的施工风险和工程投资。论文从隧道限界、材料标准、衬砌缺陷及病害等情况对西岭隧道进行分析,对限界、衬砌结构、耐久性、电气化措施等工程改造方案进行了比选研究,提出既有隧道电气化改造设计原则和方案。Restricted by the existing tunnel headroom conditions,lining strength and limits,tunnel engineering design in the electrification transformation is often a major difficulty for the entire project,which also affects the construction risk and project investment of the entire project.In this paper,the current situation of Xiling Tunnel from tunnel limits,material standards,lining defects and diseases,etc.is analyzed,and engineering transformation programs such as limits,lining,durability,and electrification measures are compared and studied,and the design principles and programs for electrification transformation of existing tunnels are proposed.
分 类 号:U452.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7