检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孟庆锋 MENG Qing-feng(First Engineering.of CCCC Third Highway Engineering Co.Ltd.,Beijing 100000,China)
机构地区:[1]中交三公局第一工程有限公司,北京100000
出 处:《工程建设与设计》2022年第22期130-132,共3页Construction & Design for Engineering
摘 要:以大磅山隧道工程为例,提出以地质分析法为基础,辅以物探法、钻探法等,集多项方法的探测结果于一体,综合评估地质条件。同时,分析了关键的施工方法及具体操作要点,根据综合超前地质探测结果预测隧址区的地质条件规划施工方案,优化施工技术,加强安全管控,以便安全、高效地完成隧道的施工作业。Taking Dabangshan Tunnel project as an example,based on geological analysis method,supplemented by geophysical method,drilling method and other methods,the paper puts forward a comprehensive evaluation method of geological conditions which integrates the detection results of multiple methods.At the same time,?paper analyzes the key methods and specific operation points,predicts the geological conditions of the tunnel site according to the comprehensive advanced geological detection results,plans the construction scheme,optimizes the construction technology,and strengthens the safety control,so as to complete the tunnel construction work safely and efficiently.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.31.119