检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:成鹏 Cheng Peng(Shanxi Fenxi Zhengsheng Coal Industry Co.,Ltd.,Fenyang Shanxi 032200)
机构地区:[1]山西汾西正升煤业有限责任公司,山西汾阳032200
出 处:《晋控科学技术》2022年第5期11-13,共3页Jinneng Holding Science and Technology
摘 要:针对S205综放工作面在末采及回撤期间所面临的采空区自然发火险情,在分析CO浓度超限原因的基础上,制定了调整通风方式、向采空区注黄泥浆、工作面架间注高分子胶体等综合防灭火技术方案,并对工艺流程及技术参数进行设计,经工业性试验及监测数据分析,CO浓度很快降至正常范围,综合防灭火措施起到了很好的防灭火效果,技术及安全效益显著。Aiming at the danger of goaf spontaneous combustion in S205 fully mechanized top coal caving face during the final mining and withdrawal period, based on the analysis of the reasons for CO concentration exceeding the limit, comprehensive fire prevention and extinguishment technical schemes such as adjusting the ventilation mode,injecting yellow mud into the goaf, and injecting polymer colloid between the supports in the face were formulated, and the process flow and technical parameters were designed. Through industrial tests and monitoring data analysis, the CO concentration quickly dropped to the normal range, The comprehensive fire prevention and extinguishment measures have played a very good role in fire prevention and extinguishment, with significant technical and safety benefits.
关 键 词:工作面末采及回撤 防灭火 采空区注浆 钻孔 高分子胶体
分 类 号:TD752[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70