马兰矿2#煤层回采巷道锚杆锚索联合支护技术研究  被引量:1

Research on combined support technology of bolt,bolt and cable in No.2 coal seam mining roadway in Malan Mine

在线阅读下载全文

作  者:李晓明 Li Xiaoming(Shanxi Coking Coal Xishan Coal Electricity Co.,Ltd.,Gujiao Shanxi 030205)

机构地区:[1]山西焦煤西山煤电马兰矿,山西古交030205

出  处:《晋控科学技术》2022年第5期44-47,共4页Jinneng Holding Science and Technology

摘  要:针对马兰矿10106工作面运输巷围岩变形破坏严重、采掘过程中围岩容易垮落、锚杆失效等问题,结合该工作面的工程地质条件,采用数值模拟与现场实践相结合的方法,探究锚杆索等支护参数对巷道围岩变形的影响,确定了锚杆索联合支护技术方案,取得了显著效果。In view of the serious deformation and damage of the surrounding rock of the transportation roadway in the 10106 working face of Malan Coal Mine, the surrounding rock is easy to collapse and the anchor bolt is easy to fail during the mining process, combined with the engineering geological conditions of the working face, the method of combining numerical simulation with underground practice is adopted to explore the influence of the support parameters such as anchor bolt and cable on the deformation of the surrounding rock of the roadway, and the technical scheme of combined support of anchor bolt and cable is determined, which has achieved remarkable results.

关 键 词:围岩变形 数值模型 现场试验 有效控制 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象