检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘丹 金国栋[1] 杨钦 刘健[1] 冯少凯 LIU Dan;JIN Guodong;YANG Qing;LIU Jian;FENG Shaokai(China Construction Eighth Engineering Division Co.,Ltd.,Shanghai 200120,China)
机构地区:[1]中国建筑第八工程局有限公司,上海200120
出 处:《工程建设》2023年第1期60-64,共5页Engineering Construction
摘 要:为了解决直线加速器机房施工过程中的重难点,本文结合“平疫结合”大型医院的工程实例,从混凝土原材料设计、大体积混凝土早期温度场分析、大体积混凝土测温管控、BIM技术辅助高大支模、预留预埋深化设计等方面进行了详细分析,总结了相应的施工操作要点,从而保证了直线加速器机房的施工质量,可为类似工程提供借鉴。In order to solve the difficulties in the construction of linear accelerator room,combined with the engineering example of“combination of normal condition with emergency”of a large hospital,a detailed analysis is conducted from the aspects of concrete raw material design,early temperature field analysis of mass concrete,temperature measurement and control of mass concrete,BIM technology-assisted high form erecting,reserved embedded deepening design,etc.,and the corresponding construction operation points are summarized,so as to ensure the construction quality of linear accelerator room and provide references for similar projects.
关 键 词:直线加速器机房 大体积混凝土 水化热 超高支模 BIM技术
分 类 号:TU71[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112