检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张文豪 Zhang Wenhao(Technology Center of Xishan Coal Power Group Co.,Ltd.,Taiyuan,Shanxi 030053)
机构地区:[1]西山煤电集团有限责任公司技术中心,山西太原030053
出 处:《江西煤炭科技》2023年第1期64-66,70,共4页Jiangxi Coal Science & Technology
摘 要:因屯兰矿20105工作面皮带顺槽回采期间变形严重,为保证临近的28107皮带顺槽不出现类似问题,拟采用数值模拟方法对顺槽稳定性进行探讨;分析得到巷道顶板锚杆、锚索承受的最大应力为426.7 kN,超过锚杆、锚索极限拉拔应力,拟定增加U型钢等加强支护措施;实践中,经30天矿压观测,顶板最大位移量98 mm,巷道围岩稳定;该支护技术具有一定推广意义。Due to the serious deformation of the belt roadway in the 20105 working face of Tunlan Colliery,to ensure that the adjacent 28107 belt entry does not have similar problems,the numerical simulation method is proposed to discuss the stability of the roadway,the maximum stress of roof bolt and anchor cable is 426.7 kN,which exceeds the limit pulling stress of bolt and anchor cable.It is proposed to add U-shaped steel and other strengthening support measures,whose application shows that the maximum displacement of roof is 98 mm,the surrounding rock of roadway is stable and the support technology has certain popularization significance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49