检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李永超
机构地区:[1]山东省高速养护集团有限公司,济南250000
出 处:《科技创新与应用》2023年第4期193-196,共4页Technology Innovation and Application
摘 要:高速公路桥梁项目施工环节,高墩是重要的施工部位,也是施工难点,施工工艺、技术保证、质量控制措施尤为重要,爬模工艺作为高墩施工的优秀解决方案,有许多技术控制要点,该文通过概述临淄至临沂高速公路工程桥梁实心高墩柱爬模施工工艺,结合相应的施工要点展开论述,旨在提供参考。In the construction link of expressway bridge project,high pier is not only an important construction part,but also a construction difficulty,and construction technology,technical guarantee and quality control measures are particularly important.Climbing formwork technology is an excellent solution for high pier construction.There are many technical control points.This paper summarizes the climbing formwork construction technology of solid high pier column of Linzi-Linyi expressway project,combined with the corresponding construction key points,in order to provide reference.
分 类 号:U445.559[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170