检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王江[1] Wang Jiang(China Railway 18th Bureau Group Tunnel Engineering Co.,Ltd.,Chongqing400700,China)
机构地区:[1]中铁十八局集团隧道工程有限公司,重庆400700
出 处:《中国建筑防水》2023年第2期41-46,共6页China Building Waterproofing
摘 要:结合引绰济辽输水工程引水隧洞富水段工程案例,介绍了掌子面超前高压灌浆、地表高压灌浆和新型聚氨酯灌浆材料(OPU)封堵隧洞出水点等综合阻水方式,对涌水点进行封堵后,掌子面前方及洞身围岩实现有效固结,达到了隧洞涌水治理的目的,阻水、固结效果良好。Combined with the case of the water-rich section of the diversion tunnel of Zhuo’er River to Liao River Water Diversion Project,this paper introduces the comprehensive water blocking methods such as the advanced high-pressure grouting of the face,the earth surface high-pressure grouting and new polyurethane grouting material(OPU)to block the outlet of the tunnel.After the water inrush point is blocked,the surrounding rock in front of the face and the tunnel body can be effectively consolidated,the purpose of water inrush control of the tunnel is achieved,and the water blocking and consolidation effect is good.
关 键 词:引水隧洞 富水段 涌水治理 灌浆阻水 聚氨酯灌浆材料
分 类 号:U457[建筑科学—桥梁与隧道工程] TU761.11[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.20.238.29