检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴骏 任少义 张石 WU Jun;REN Shaoyi;ZHANG Shi(Longyuan(Beijing)Wind Power Engineering Technology Co.,Ltd.,Beijing 100034,China)
机构地区:[1]龙源(北京)风电工程技术有限公司,北京100034
出 处:《风力发电》2022年第2期12-16,共5页Wind Power
摘 要:以新能源为主体的新型电力系统成为发展趋势,更大规模更高比例新能源发电接入电力系统,将面临更大面积更严重的限电局面,本文从新能源场站角度提出AGC子站控制策略优化方案,并在实际风电场应用预计能够降低场站限电量,并对AGC主站提出控制策略优化建议,能够有效推动降低区域新能源限电水平。The renewable energy based power system has become the trend of development.More large-scale and higher proportion of renewable energy power generation will be connected to the power system,which will face a larger area and more serious power limit situation.This paper puts forward the optimization scheme of AGC sub-station control strategy from the perspective of new energy stations,and it is expected to reduce the power limit of stations in practical wind farms.This paper also gives some suggestions on control strategy optimization for AGC master station,which can effectively promote the reduction of regional new energy power limit levels.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.156.0