张吉怀高铁沙堤所设置临时限速引起列车制动问题的探讨  被引量:3

Discussion on Problem of Train Braking Caused by Temporary Speed Limit Set at Shadisuo Station of Zhangjiajie-Jishou-Huaihua High-speed Railway

在线阅读下载全文

作  者:方明亮 Fang Mingliang(Huaishaoheng Railway Co.,Ltd.,Changsha 410027,China)

机构地区:[1]怀邵衡铁路有限责任公司,长沙410027

出  处:《铁路通信信号工程技术》2023年第2期95-100,共6页Railway Signalling & Communication Engineering

摘  要:张吉怀高铁沙堤所至张家界西黔张常场联络线上CTCS-3转CTCS-2级间切换过程中,设置特定的临时限速时部分车载会触发最大常用制动。针对上述场景,分析问题成因,并结合地面、车载设备的匹配关系对解决方案进行探讨。In the process of transition from CTCS-3 to CTCS-2 on the connection line between Zhang-jiajie-Jishou-Huaihua high-speed railway Shadisuo station and Zhangjiajie West Qianzhangchang field, when a specific temporary speed limit is set, some onboard equipment will trigger the maximum service braking. In view of the above scenarios, this paper analyzes the reasons behind the problem and solutions are discussed in terms of the matching relationship between ground and onboard equipment.

关 键 词:级间切换 临时限速 最大常用制动 

分 类 号:U284.48[交通运输工程—交通信息工程及控制]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象