检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄杰卿 HUANG Jieqing(Zhejiang DaDi Geotechnical Investigation Co.,Ltd.,Hangzhou 310008,Zhejiang,China)
机构地区:[1]浙江大地勘测设计有限公司,浙江杭州310008
出 处:《建筑施工》2023年第1期22-25,29,共5页Building Construction
摘 要:杭州市某小学局部设1层地下室,基坑西侧为地铁4号线隧道,围护结构距离右线隧道最小仅6.90 m。为更好地保护地铁隧道,基坑西侧采用了“多次换撑技术”。有限元计算结果表明,相比于单次换撑,采用多次换撑技术的隧道沉降量和水平收敛分别减少22.41%和21.63%。多次换撑计算结果与监测结果较为接近,表明该技术有助于控制隧道变形,保证隧道安全。A primary school in Hangzhou is partially equipped with a basement.The west side of the foundation pit is the subway line 4 tunnel.The minimum distance between the support structure and the right line tunnel is 6.90 m.In order to better protect the subway tunnel,the west side of the foundation pit adopts the"multiple support replacement technology".The results of finite element calculation show that when comparing with single support replacement,the settlement and horizontal convergence of tunnel with multiple support replacement technology are reduced by 22.41%and 21.63%,respectively.The calculation results of multiple support replacement are close to the monitoring results,which is helpful to control the tunnel deformation and ensure the tunnel safety.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38