检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴水根[1,2] 余海龙 吕兆华 WU Shuigen;YU Hailong;LÜ Zhaohua(College of Civil Engineering,Tongji University,Shanghai 200092,China;Tongji Architectural Design(Group)Co.,Ltd.,Shanghai 200092,China)
机构地区:[1]同济大学土木工程学院,上海200092 [2]同济大学建筑设计研究院(集团)有限公司,上海200092
出 处:《建筑施工》2023年第1期40-46,共7页Building Construction
摘 要:新型型钢骨架复合墙板全板式低层装配式房屋结构体系,采用由型钢与多层芯材组成的复合墙板作为主要承重构件,墙板间采取钢卯榫形式节点,主要适用于1~3层房屋。对复合墙板结构体系和构件安装施工的重难点进行研究,采用压杆模型讨论了芯材对结构受力的贡献,依据墙板特性对已有压杆截面高度计算公式进行修正,针对钢卯榫节点提出了分离型钢和连接螺栓模型。建立结构体系计算模型和墙板吊装模型,就结构体系和墙板吊装进行有限元分析,验证了结构可行性和吊装方案可靠性,为今后类似工程提供参考。The new type of structural system of low-rise prefabricated building with full panel composite wallboard with profile steel frame adopts the composite wallboard composed of profile steel and multi-layer core materials as the main load-bearing component,and the joints between wallboards are in the form of steel mortise and tenon,which is mainly applicable to buildings with 1–3 floors.The key and difficult points in the installation and construction of composite wallboard structure system and components are studied.The contribution of core materials to the structural stress is discussed by using the strut model.According to the characteristics of wallboard,the calculation formula of the height of the existing strut section is modified.For the steel mortise and tenon joints,the separate section steel and connecting bolt models are proposed.The structural system calculation model and wallboard hoisting model are established,the structural system and wallboard hoisting are analyzed by finite element method,and the structural feasibility and hoisting scheme reliability are verified,which provides reference for similar projects in the future.
关 键 词:装配式结构 预制墙板 吊装 施工技术 有限元模拟
分 类 号:TU765[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.122.6