检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张帅 梁明华 ZHANG Shuai;LIANG Ming-hua(China Water Conservancy and Hydropower Construction Bureau Co.,Ltd.,Zhengzhou,450001,China)
机构地区:[1]中国水利水电第十一工程局有限公司,河南郑州450001
出 处:《水电站机电技术》2023年第2期43-45,69,147,共5页Mechanical & Electrical Technique of Hydropower Station
摘 要:为改造水电站厂房与大坝之间的通信问题,对尼泊尔上博迪克西水电站通信系统进行升级改造,以合理选址,考虑运行安全、数据传输稳定、提高发电效益等几个方面为出发点,将微波通信设备运用到此次改造中,并通过合理的细节设计,精细的安装工艺将此次改造效果最大化。In order to improve the communication between powerhouse and dam of hydropower station,the microwave communication equipment will be used in the reconstruction through the upgrading and reconstruction of communication system of the Upper Bodhisi Hydropower Station in Nepal.The selection of a reasonable location,the consideration of operation safety,the stability of data transmission,the improvement of power generation efficiency,and the optimization of the reconstruction effect will be achieved through the reasonable detailed design and the fine installation process.
分 类 号:TN928[电子电信—通信与信息系统]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200