检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:樊志明 FAN Zhi-ming(Sujin Shuozhou Coal Gangue Power Generation Co.,Ltd.,Shuozhou 036800,China)
机构地区:[1]苏晋朔州煤矸石发电有限公司,山西朔州036800
出 处:《电力学报》2022年第6期553-560,共8页Journal of Electric Power
摘 要:某660 MW锅炉外置床高温再热器投运后存在左右侧汽温偏差、管屏间温度偏差大、同屏管汽温偏差等问题。为此,介绍了该高温再热器的结构和运行参数;根据实际运行情况,统计分析了额定负荷工况下,该高温再热器管屏和吊挂管的壁温、热偏差系数的分布情况。分析结果表明,受热面材质选择合理,未出现管壁超温现象,但存在管屏间温差大,靠近两侧壁处灰流化不良,管内蒸汽流量偏差等问题。总结分析了该高温再热器的运行情况,并提出了运行和结构方面的改进措施,可为同型锅炉外置床高温再热器的设计优化和性能提升提供参考和支持。After the high temperature reheater in external bed exchange of a 660 MW boiler is put into operation, there are problems such as steam temperature deviation on the left and right sides, large temperature deviation between tube panels, steam temperature deviation in the same tube panel. Therefore, the structure and operation parameters of the high temperature reheater are introduced. According to the actual operation, the distribution of wall temperature and thermal deviation coefficient of the tube panel and hanging tube of the high temperature reheater under the rated load operation condition is statistically analyzed. The analysis results show that, the material selection of the heating surface is reasonable, and there is no tube wall overtemperature phenomenon, but there are problems such as large temperature difference between tube panels, poor ash fluidization near both sides of the wall, and deviation of steam flow in the tube. The operation of the high temperature reheater is summarized and analyzed, and the improvement measures in operation and structure are proposed. It provides reference and support for the design optimization and performance improvement for reheater in the external bed exchange in the same type boiler.
关 键 词:660 MW超临界CFB锅炉 外置床高温再热器 管屏 热偏差特性
分 类 号:TK229.6[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3