检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李振兴 LI Zhen-xing(China Railway No.5 Group Electricity Co.Ltd.,Changsha 410000,China)
出 处:《工程建设与设计》2023年第3期79-81,共3页Construction & Design for Engineering
摘 要:针对普速铁路电气化改造问题,分析了接触网悬挂技术的运用的现状,通过解决接触网悬拉弧现象、提高接触网悬挂零部件安装质量、接触网负荷增加问题改造,归纳接触网悬挂施工的技术流程和方法,并且探讨了提高普速铁路电气化改造水平的有效途径。Aiming at the electrification transformation of general-speed railway,this paper analyzes the present situation of the application of catenary suspension technology,and probes into the effective ways to improve the electrification transformation level of general-speed railway by solving the catenary suspension arc phenomenon,improving the installation quality of catenary suspension parts,improving the problem of catenary load increase,and summarizing the technical process of catenary suspension construction.
分 类 号:U225[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.81.99