梅山特大桥钢箱梁顶推施工技术控制措施  被引量:1

Technical Control Measures for Jacking Construction of Steel Box Girder of Meishan Super Large Bridge

在线阅读下载全文

作  者:卢相 LU Xiang(China Rail Way11th Bureau Group Second Engineering Co.Ltd.,Tongren 811300,China)

机构地区:[1]中铁十一局集团第二工程有限公司,青海同仁811300

出  处:《工程建设与设计》2023年第3期204-206,共3页Construction & Design for Engineering

摘  要:顶推法施工可以使用相对简单的设备建造长、大桥梁,具有施工平稳无噪声、综合费用低、便于施工管理等优点。论文对某桥梁工程钢箱梁顶推施工技术控制措施进行研究,以实际工程案例为抓手,对各种技术细节展开分析,提高技术应用水平。The jacking method can use relatively simple equipment to build long and large bridges,and has the advantages of stable construction without any problems.It has the advantages of low noise,low comprehensive cost,and easy construction management.In this paper,the control measures of steel box girder jacking construction technology of a bridge project are studied,and various technical details are analyzed to improve the technical application level with practical engineering cases as the starting point.

关 键 词:桥梁工程 箱梁施工 顶推施工技术 控制措施 

分 类 号:U445[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象