检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吕莹 杨光[1] 魏春 刘敏达 LV Ying;YANG Guang;WEI Chun;LIU Min-da(Wuxi Municipal Design Institute Co.Ltd.,Wuxi 214100,China)
机构地区:[1]无锡市政设计研究院有限公司,江苏无锡214100
出 处:《工程建设与设计》2023年第3期250-253,共4页Construction & Design for Engineering
摘 要:通过模糊层次法对锡山经济技术开发区新材料产业园污水处理厂总承包项目的实施效果进行综合评价,确定和优化了总承包模式下项目的实施效果评价指标体系,建立了相应的评价模型。结果表明:此污水处理厂项目的关键性评价指标为进度管理、成本管理、质量控制和HSE管理,工程总承包模式下此项目的实施效果较为理想。The implementation effect of the general contracting project of the sewage treatment plant in the new material industrial park of Xishan Economic and Technological Development Zone was comprehensively evaluated by the fuzzy AHP,the implementation effect evaluation index system of the project under the general contracting mode was determined and optimized,and the implementation effect evaluation model was established.The results showed that the key evaluation indicators of this sewage treatment plant project were schedule management,cost management,quality control and HSE management.The implementation effect of this project under the general contracting mode was ideal.
分 类 号:TU-9[建筑科学] X703[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.86.62