主从博弈框架下配电网规划运行多目标协同优化方法  被引量:13

Multi-Objective Cooperative Optimization Method of Distribution Network Planning and Operation Under the Stackelberg Game Framework

在线阅读下载全文

作  者:冯喜春 韩璟琳 赵辉 陈志永 王涛 李铁良 孙轶良 何鑫 FENG Xichun;HAN Jinglin;ZHAO Hui;CHEN Zhiyong;WANG Tao;LI Tieliang;SUN Yiliang;HE Xin(State Grid Hebei Economic Research Institute,Shijiazhuang 050000,China;State Grid Hebei Electric Power Co.,Ltd.,Shijiazhuang 050000,China;State Grid Hengshui Electric Power Supply Company,Hengshui,Hebei 053000,China;Beijing China-Power Information Technology Co.,Ltd.,Beijing 100107,China)

机构地区:[1]国网河北省电力有限公司经济技术研究院,石家庄050000 [2]国网河北省电力有限公司,石家庄050000 [3]国网河北省电力有限公司衡水供电分公司,河北衡水053000 [4]北京中电普华信息技术有限公司,北京100107

出  处:《南方电网技术》2023年第1期26-34,72,共10页Southern Power System Technology

基  金:河北省电力公司科技项目(SGHEJY00GHJS2000103)。

摘  要:针对配电网网架结构和分布式电源的规划阶段与电网运行阶段存在的交互影响作用,首先,提出了以配电网规划效益与电网运行下用户效用最优为目标的双层协同的规划运行优化框架;其次,以配电网规划中经济性与可靠性最大为目标,规划配电网网架结构与分布式电源接入节点,构建可靠性约束下配电网多目标规划模型,并基于NSGA-Ⅱ算法提出多目标配电网规划模型的求解方法;然后建立考虑电网运行阶段与用户运行调度策略下的分布式电源规划模型,提出了光伏储能规划策略与用户负荷与储能设备的运行调控策略。基于电网公司与用户之间双层规划问题,提出了一种计及电网公司与用户之间互动响应的主从博弈模型。最后,通过实际算例结果表明所提主从博弈下源网协同的规划运行模型可以有效提高电网公司与用户效益,提升电网运行可靠性。In view of the interaction between distribution network structure and distributed power generation planning stage and power grid operation stage,a coordinated planning operation model under the Stackelberg game framework and its solution algorithm between power grid company and consumers is proposed.Firstly,a bi-level coordinated planning and operation optimization framework is proposed,aiming at the optimization of the benefit of the distribution network company and utility of consumers.Secondly,aiming at the maximum economy and reliability in distribution network planning,the distribution network grid structure and distributed power access nodes are optimized.A multi-objective planning model for distribution network under reliability constraints is built,and a solution method for the multi-objective distribution network planning model is proposed based on the NSGA-Ⅱ.Then,a distributed generation planning model considering the grid operation stage and consumers’operating strategies is established,and consumers’load and energy storage equipment operation strategies are proposed.Thirdly,based on the bi-level planning problem,an Stackelberg game model is proposed which considers the interactions between the power grid company and consumers.Finally,through the simulation analysis of practical example,the results show that the proposed cooperative optimization method of distribution network planning and operation strategies under the Stackelberg game model can effectively improve the benefits of both power grid company and consumers,and further improve the reliability of power grid operation.

关 键 词:配电网规划 多目标优化 NSGA-Ⅱ算法 双层协同优化 主从博弈 

分 类 号:TM715[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象