检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何冰山 朱先均 邱井东 HE Bingshan;ZHU Xianjun;QIU Jingdong(China Five Metallurgical Group Co.,Ltd.,Chengdu Sichuan 610000,China)
出 处:《工程质量》2023年第2期17-19,25,共4页Construction Quality
摘 要:在桥梁建设施工中,单桩接柱桥梁设计比较常见。在德阳市高新区蒋家河桥桩接柱施工上采用的桩基顶预埋墩柱钢筋骨架方式既确保了成桩检测长度不受影响,又实现精准定位。论文通过对比传统桩接柱方式和该预埋骨架方式,进一步验证了预埋骨架方式在实际施工应用的可行性和优点。In bridge construction,the design of single pile to column bridge is common. In the construction of pile connection of Jiangjiahe bridge in Deyang high tech Zone,the method of embedded pier column reinforcement skeleton at the top of pile foundation not only ensures that the detection length of pile is not affected,but also realizes accurate positioning. This paper further verifies the feasibility and advantages of the embedded skeleton method in practical construction by comparing the traditional pile column connection method with the embedded skeleton method.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222