检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程强[1,2] 高元杰 初红艳[1,2] 张彩霞 刘志峰[1,3] CHENG Qiang;GAO Yuanjie;CHU Hongyan;ZHANG Caixia;LIU Zhifeng(Institute of Advanced Manufacturing and Intelligent Technology,Beijing University of Technology,Beijing 100124,China;Beijing Key Laboratory of Advanced Manufacturing Technology,Beijing University of Technology,Beijing 100124,China;Mechinery Industry Key Laboratory of Heavy Machine Tool Digital Design and Testing Technology,Beijing University of Technology,Beijing 100124,China)
机构地区:[1]北京工业大学先进制造与智能技术研究所,北京100124 [2]北京工业大学先进制造技术北京市重点实验室,北京100124 [3]北京工业大学机械工业重型机床数字化设计与测试技术重点实验室,北京100124
出 处:《北京工业大学学报》2023年第3期335-345,共11页Journal of Beijing University of Technology
摘 要:柔性作业车间的多品种、多件数导致调度难度大、耗费时间较长和成本较高,为此,以最大完工时间、能耗和刀具损耗数量为优化目标,考虑返工、次序的准备时间和批量调度约束,建立了多目标机加工柔性作业车间调度模型.提出一种引入综合考虑能耗和加工时间的轮盘赌初始化策略.针对传统差分进化算法交叉得到的子代机器部分质量较差,提出一种机器选择的策略,以此对差分进化算法进行了改进.将改进后的差分进化算法应用于机加工柔性作业车间调度,并与传统差分进化算法在机加工柔性作业车间调度进行多组实验对比.结果表明:改进差分进化在机加工柔性作业车间调度较传统差分进化算法具有收敛速度较快、鲁棒性较好的优点,优化后各机器负载更为均衡,可有效解决多目标机加工柔性作业车间调度问题,为多品种、多件数类排产任务提供了一种良好的指导方案.Flexible job shop scheduling is difficult,time-consuming and cost-effective due to its variety and number of pieces.In this paper,a multi-objective flexible job shop scheduling model for machining was established with the optimization objectives of maximum completion time,energy consumption and tool loss,considering rework,preparation time of sequence and batch scheduling constraints.A multi-objective flexible job shop scheduling model considering energy consumption and tool loss was proposed,and a machine selection strategy was proposed to improve the differential evolution algorithm.The improved differential evolution algorithm was applied to machining flexible job shop scheduling.Compared with the traditional differential evolution algorithm,the improved differential evolution algorithm has the advantages of faster convergence speed and better robustness,and the optimized machine load is more balanced,which can effectively solve the multi-objective machining flexible job shop scheduling problem,and provide a good guidance for multi variety and multi piece scheduling tasks plan.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222