浅谈汽车工厂涂装车间设备交割前期验证策划  

Brief Discussion on Preliminary Verification Planning of Equipment Delivery in Painting Workshop of Automobile Factory

在线阅读下载全文

作  者:李志杰[1] 刘铁锁[1] 张腾飞[1] 郭志强[1] 李玉鹏[1] 马少乾 谢世雄 王浩[1] 文超群 LI Zhi-jie;LIU Tie-suo;ZHANG Teng-fei;GUO Zhi-qiang;LI Yu-peng;MA Shao-qian;XIE Shi-xiong;WANG Hao;WEN Chao-qun(Great Wall Motor Co.,Ltd.,Hebei Automotive Engineering and Technology Research Center,Baoding 071000,Hebei,China)

机构地区:[1]长城汽车股份有限公司,河北省汽车工程技术研究中心,河北保定071000

出  处:《现代涂料与涂装》2023年第1期34-36,共3页Modern Paint & Finishing

摘  要:通过设备交割前期验证策划,包括设备交割改造工艺策划、设备交割改造方向、设备交割改造验证方法和设备交割验证注意事项等,能快速识别交割设备存在问题,制定改造方案,最终实现工艺策划SOP目标。Throughtheequipment delivery prevalidation planning,including equipment delivery transformation process planning,eequipmentdeliverytransformation direction,equipment delivery transformation verification method and equipment delivery verification precautions,delivery equipment problems was quickly identified,transformation plan was developed,and finally the process planning SOP objectives were achieved.

关 键 词:设备交割 静态验证 动态验证 

分 类 号:TQ639[化学工程—精细化工]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象