作 者:蔡连利 CAI Lianli(China Railway Sixteenth Bureau Group Co.,Ltd.,Beijing 100018,China)
出 处:《路基工程》2023年第1期228-233,共6页Subgrade Engineering
基 金:中铁十六局集团北京轨道交通工程建设有限公司科技研发计划项目(KYJS-001)。
摘 要:依托郑州市冀州路明挖隧道基坑施工,采用有限元分析软件建立三维数值模型,研究堆载对基坑周围土体沉降、坑底隆起及桩身水平位移的影响,结果表明:基坑周围土体沉降、坑底隆起变形及桩身水平位移均随基坑开挖而逐渐增大;基坑围护结构的变形量均在设计控制范围内,在该施工条件下,基坑结构整体安全。In relation to the pit construction of Jizhou road open-cut tunnel in Zhengzhou, a three-dimensional numerical model is established by finite element analysis software, and the influence of heaped load on the settlement of soil around the pit, the upheaval of the pit bottom and the horizontal displacement of the pile shaft is studied. The results show that the settlement of soil around the pit, the upheaval of the pit bottom and the horizontal displacement of the pile shaft increase gradually with the excavation of the pit. The deformation of the pitsupport structure is within the design control range. Under this construction condition, the pit structure is safe on the whole.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.103.13