检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姬永红 张琪 都琳 殷仕睿 JI Yonghong;ZHANG Qi;DU Lin;YIN Shirui
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092 [2]成都市蓉城管线投资有限公司,四川成都610036
出 处:《城市道桥与防洪》2023年第2期253-257,共5页Urban Roads Bridges & Flood Control
摘 要:结合成都市管廊建设区域的IT大道地下综合管廊典型案例,提出了适用于成都市地下综合管廊有偿使用费测算方法,构建了各管线单位入廊费以及日常维护费的收费模型。基于此,开展了电力电缆纳入城市地下综合管廊与常规管线敷设线路的经济与社会效益差异性研究,系统地分析了在全寿命周期内电力电缆入廊对电力管线单位成本影响规律,为今后电力电缆入廊收费政策的实施提供理论依据。Combined with the typical case of underground utility tunnel in IT Avenue in the construction area of utility tunnel in Chengdu, the method suitable for calculating the paid use fee of underground utility tunnel in Chengdu is put forward, and the charging model of each pipeline fee into utility tunnel and daily maintenance fee is built. Based on this, the difference of economic and social benefits between the power cable into urban underground utility tunnel and the conventional pipeline laying lines is studied, and the influence law of power cable into utility tunnel on the cost of power pipeline unit in the whole life cycle is systematically analyzed, which provide a theoretical basis for the implementation of charging polity for power cable into utility tunnel in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7