检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:弓林娟 侯国莲[1] 胡博 黄婷 黄从智[1] 周桂平 张建华[1] GONG Linjuan;HOU Guolian;HU Bo;HUANG Ting;HUANG Congzhi;ZHOU Guiping;ZHANG Jianhua(School of Control and Computer Engineering,North China Electric Power University,Changping District,Beijing 102206,China;State Grid Liaoning Electric Power Company Ltd.,Shenyang 110006,Liaoning Province,China)
机构地区:[1]华北电力大学控制与计算机工程学院,北京市昌平区102206 [2]国网辽宁省电力有限公司,辽宁省沈阳市110006
出 处:《中国电机工程学报》2023年第3期1048-1059,共12页Proceedings of the CSEE
基 金:国家重点研发计划项目(2019YFB1505400)。
摘 要:为实现“碳达峰、碳中和”目标下超临界机组的低碳灵活运行,提出一种计及机组灵活性、经济性和环保性的模糊广义预测控制策略。基于超临界机组调峰需求下的预测模型,首先构建包含一般控制目标和节能减排需求的综合滚动优化目标。然后,利用模糊选择确定目标函数中各子目标的加权系数以消除参数不确定性的影响。其中,模糊选择过程中模糊规则的制定以跟踪误差和碳排放增量为输入,加权系数为输出。进而通过预测模型、反馈校正与所设计滚动优化的协调配合求取最优控制律。最后,立足于我国大连某电厂600MW超临界机组运行数据进行所提控制策略的有效性验证。该方法在机组快速负荷调控、抗扰动及节能减排等方面均具有显著优势。In order to realize the low-carbon flexible operation of supercritical units under the goal of“peaking carbon dioxide emission and achieving carbon neutrality”,a fuzzy generalized predictive control strategy considering the flexibility,economy and environmental protection is proposed.Based on the prediction model of supercritical unit under peak shaving demand,a comprehensive rolling optimization objective including general control objectives and emission reduction requirements is constructed.Then,the fuzzy selection is used to determine the weighting coefficients of each sub-objective in the objective function to eliminate the influence of parameter uncertainty.In the fuzzy rules defined for coefficient selection,tracking error and carbon emission increment are taken as input variables while the weighting coefficients are deemed as output variables.Next,the optimal control law is obtained through coordination of the prediction model,feedback correction and the designed rolling optimization.Finally,the effectiveness of the proposed control strategy is verified using the on-site data of a 600MW supercritical unit in Dalian,China.The proposed method reveals its superiority in fast load regulation,disturbance rejection,energy conservation and emission reduction.
关 键 词:超临界机组 低碳灵活运行 模糊广义预测控制 节能减排 模糊选择
分 类 号:TM62[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28