黄河三盛公库区河段桥梁通航水位分析  被引量:1

Analysis on navigable water level of bridges in the Sanshenggong reservoir reach of the Yellow River

在线阅读下载全文

作  者:刘晓辉 张文忠[2] LIU Xiao-hui;ZHANG Wen-zhong(CCCC Tianjin Port Engineering Design&Consulting Co.,Ltd.,Tianjin 300461,China;Tianjin Port Engineering Institute Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300222,China)

机构地区:[1]中交天津港湾工程设计院有限公司,天津300461 [2]中交天津港湾工程研究院有限公司,天津300222

出  处:《中国港湾建设》2023年第2期61-65,共5页China Harbour Engineering

摘  要:以黄河三盛公库区河段为例,研究枢纽上游河段设计通航水位的确定方法,为河段桥梁设计和通航条件影响评价提供依据。研究河段为黄河闸坝式平原低水头水库库区河段,各级入库流量与设计重现期洪峰流量的差别较大。文章首先分析桥位附近1998年汛后、2012年汛后和2018年汛后实测大断面资料并进行库区回水计算,从安全角度选取了合适的计算断面;通过分析10 a一遇洪水与相应的汛期坝前水位组合和坝前正常蓄水位与相应的各级入库流量组合确定最高通航水位,通过多年历时保证率的入库流量与相应的坝前消落水位组合和坝前最低运行水位与相应的各级入库流量组合确定最低通航水位。Taking the reach of the Yellow River in the Sanshenggong reservoir reach as an example,the method for determining the design navigable water level in the upstream reach of the hydro-junction on the Yellow River is studied so as to provide a basis for the design of bridges on the reach and the evaluation of the impact of navigable conditions.The target reach of this study is the reach of the Yellow River with sluice dams in the plain low head reservoir reach,where the incoming flow at all levels and the peak discharge in the design return period differs greatly.The paper first analyzes the measured large-section data near the bridge site after the flood seasons in 1998,2012 and 2018,calculates the backwater of the reservoir reach,and selects appropriate calculation sections from the perspective of safety.The maximum navigable water level is determined by analyzing the combination of a 10-year flood with the water level before the dam in the corresponding flood season and the combination of normal pool level before the dam with the corresponding inflow flow at all levels,and the minimum navigable water level is determined by the combination of incoming flow with multi-year guarantee rate with the corresponding drawdown water level before the dam and the combination of minimum operating water level before the dam with the corresponding incoming flow at all levels.

关 键 词:库区河段 通航水位 回水计算 

分 类 号:U612.23[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象