检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梅笑妍 柴植 Mei Xiao-yan;Chai Zhi(School of Electric Power Engineering,Nanjing Institute of Technology,Nanjing 211167,Jiangsu Province,China)
机构地区:[1]南京工程学院电力工程学院,江苏南京211167
出 处:《科学与信息化》2023年第4期111-113,共3页Technology and Information
摘 要:碳减排已成为全球共识,为了实现"双碳"目标,我国在碳减排进程中提出了"整县光伏"策略.本文以一个计划推进整县光伏的县级电网为例,基于太阳能资源以及现有网架结构,对影响整县光伏实施的关键约束环节进行分析,总结并提出电网容量约束、电压降落约束两大约束条件,并对约束情况进行了具体分析,提出了解决办法.Carbon emission reduction has become a global consensus,in order to achieve the goal of“dual carbon”,China proposes the“county-wide photovoltaic”strategy in the process of carbon emission reduction.Taking a county-level power grid that plans to promote photovoltaic access in the whole county as an example,based on solar energy resources and the existing grid structure,this paper analyzes the key constraints affecting the implementation of photovoltaic access in the whole county,summarizes and puts forward two major constraint conditions of grid capacity constraint and voltage drop constraint,and analyzes the constraint situation and proposes a solution.
分 类 号:TM7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.67.34