作 者:唐永智 韩颢 赵萌 TANG Yong-zhi;HAN Hao;ZHAO Meng(China United Northwest Institute for Engineering Design and Research Co.,Ltd.)
机构地区:[1]中联西北工程设计研究院有限公司,陕西西安710000
出 处:《电站系统工程》2023年第1期67-69,共3页Power System Engineering
摘 要:火力发电厂项目用水量较大,由于项目位置的不同,原水水质的差别很大,并且可使用的水处理技术也很多,根据不同的原水水质,选择一个经济、合理、可靠的原水预处理方案对于电站项目至关重要。以某电站原水预处理系统的设计为例,说明机械加速澄清池的工艺特点。Thermal power plant projects use a large amount of water, due to the different location of the project, the raw water quality varies greatly, and there are many water treatment technologies available. According to different raw water quality, it is very important to choose an economic, reasonable and reliable raw water pretreatment scheme for power plant projects. The process characteristics of mechanical clarifier are illustrated taking the design of raw water pretreatment system in a power station as example.
分 类 号:TK223.5[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147