检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王婧 段立强[1] 杨名 WANG Jing;DUAN Liqiang;YANG Ming(School of Energy Power and Mechanical Engineering,North China Electric Power University,Beijing 102206)
机构地区:[1]华北电力大学能源动力与机械工程学院,北京102206
出 处:《机械工程学报》2022年第22期416-425,共10页Journal of Mechanical Engineering
基 金:国家重点研发计划资助项目(2017YFB0602101)。
摘 要:针对650℃一次再热超超临界燃煤发电机组热力系统抽汽过热度较高、空气预热器换热温差较大的问题,在650℃基准机组基础上提出加装2级前置式蒸汽冷却器(Outside steam coolers, OSCs)(方案1)和采用前置式空气预热器+OSCs(方案2)进行性能对比研究。通过Ebsilon建模,采用单耗分析法对比了650℃一次再热机组在变工况下的能耗分布情况。结果表明:650℃一次再热机组发电煤耗比600℃二次再热机组降低10.67g·(kW·h)^(-1),比700℃一次再热机组高9.77 g·(kW·h)^(-1)(100%THA),节煤效果显著。650℃一次再热不同优化方案中,方案2在各工况下性能均优于方案1和基准机组,方案2发电煤耗246.71 g·(kW·h)^(-1)(100%THA),比方案1降低1.99 g·(kW·h)^(-1),比基准机组降低3.32 g·(kW·h)^(-1),在低负荷下仍具有良好的节煤效果。In order to solve the problems of high superheat degrees of regenerative extraction steams and large heat transfer temperature differences of air preheater in 650 ℃ single reheat advanced ultra-supercritical(A-USC) coal-fired power generation system, two optimized schemes(scheme 1 is integrated with two stages outside steam coolers(OSCs), while scheme 2 is simultaneously integrated with both OSCs and fronted air preheater(FAH) are proposed and compared on the base of the principle of energy level matching. The 650 ℃ A-USC coal-fired power generation system models are built by the Ebsilon software and the energy consumptions under off-design conditions are analysed with the unit consumption analysis method. The results show that the coal consumption of the 650 ℃ single reheat unit has remarkable coal saving effect compared with the 600 ℃ double reheat unit.The standard coal consumption of 650 ℃ single reheat unit is 10.67g·(kW·h)^(-1)lower than that of the 600 ℃ double reheat unit, and 9.77% higher than that of the 700 ℃ single reheat unit(100%THA). The standard power generation coal consumptions of optimized scheme 2 are lower than those of scheme 1 and reference system under any working condition. The standard power generation coal consumption of scheme 2 is 246.71 g·(kW·h)^(-1)(100%THA), 3.32 g·(kW·h)^(-1)lower than that of the reference system and 1.99 g·(kW·h)^(-1)lower than that of the scheme 1.
关 键 词:650℃ 先进超超临界(A-USC) 一次再热 抽汽过热度 外置式蒸汽冷却器(OSC) 单耗分析
分 类 号:TK212[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.28.86