山区变截面薄壁空心墩悬臂模板施工工艺控制要点  被引量:2

Key Points for Construction Process Control of Cantilever Formwork for Variable Cross-section Thin Wall Hollow Pier in Mountainous Area

在线阅读下载全文

作  者:王亮 郝莹莹 蒋代兵 沈钦臣 谢纯杰 WANG Liang;HAO Ying-ying;JIANG Dai-bing;SHEN Qin-chen;XIE Chun-jie(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)

机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041

出  处:《云南水力发电》2023年第2期93-98,共6页Yunnan Water Power

摘  要:以高速公路炉房沟大桥高墩变截面薄壁空心墩为例,通过对山区高墩变截面薄壁空心墩施工中的施工工艺控制要点的分析及总结,形成工艺控制要点及措施,以提高山区变截面薄壁空心墩施工的安全控制、质量控制、进度控制及成本控制水平。悬臂模板施工工艺简单、施工速度快、材料投入少、施工成本低、质量及安全保证性高、标准化程度高。Taking variable section thin-walled hollow pier of Fufanggou Bridge as an example, this paper analyses and summarizes the key construction technology control points of variable section thin-walled hollow pier of high pier in mountainous area. Finally, key points and measures of process control are formed to improve the safety control, quality control, progress control and cost control level of construction of thin-wall hollow pier with variable section in mountainous area. Cantilever formwork is characterized by simple construction process, fast construction speed, less material investment, low construction cost, high quality and safety guarantee and high degree of standardization.

关 键 词:山区高墩 薄壁空心墩 悬臂模板 施工工艺 

分 类 号:U445.55[建筑科学—桥梁与隧道工程] U445.4[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象