山区高速公路连拱隧道中导洞快速施工方法  被引量:1

Fast Construction Method for Middle Guide Tunnel of Multi-arch Tunnel on Mountainous Expressway

在线阅读下载全文

作  者:刘翠丽 LIU Cui-li(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)

机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041

出  处:《云南水力发电》2023年第2期112-115,共4页Yunnan Water Power

摘  要:山区高速公路隧道一般设置为分离式的双洞,双洞间距一般为30m左右,称之为分离式隧道。有时受地质条件以及施工工艺影响,一些隧道不得不采用连拱隧道。对连拱隧道中导洞的开挖方法、支护型式进行简要论述,结合现场实际情况,总结连拱隧道中导洞快速施工方法。Mountainous expressway tunnels are generally set as separate double tunnels with a distance of about 30m, which is called separate tunnel. Sometimes influenced by geological conditions and construction techniques,several tunnels have to use multi-arch tunnels. This paper briefly describes the excavation method and support type of the guide tunnel in the multi-arch tunnel, and summarizes the rapid construction method of the guide tunnel in the multi-arch tunnel in combination with the actual situation on site.

关 键 词:山区高速公路 连拱隧道 中导洞 施工技术 

分 类 号:U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象