检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张衍君 徐树参 刘娅菲 王晓萍[2] 葛洪魁[3] 周德胜[1] ZHANG Yanjun;XU Shucan;LIU Yafei;WANG Xiaoping;GE Hongkui;ZHOU Desheng(Xi’an Shiyou University,Xi’an 710065,Shannxi,China;Baikouquan Oil Production Plant,PetroChina Xinjiang Oilfield Company,Karamay 834000,Xinjiang,China;China University of Petroleum(Beijing),Changping 102249,Beijing,China)
机构地区:[1]西安石油大学,陕西西安710065 [2]中国石油新疆油田分公司百口泉采油厂,新疆克拉玛依834000 [3]中国石油大学(北京),北京昌平102249
出 处:《新疆石油天然气》2023年第1期1-7,共7页Xinjiang Oil & Gas
基 金:国家自然科学基金面上项目“微流控可控构建功能性微纳颗粒及其提高采收率机理研究”(52174028);国家自然科学基金重点项目“水力压裂裂缝轨迹可控性理论基础-非均质地层裂缝控制理论基础研究”(51934005)。
摘 要:压后闷井对提高页岩油储层的采收率及产量具有重要意义,闷井时间的确定尤为关键。目前,闷井时间的确定在国内外仍未形成系统、有效的方法。裂缝系统压力传递、产出液离子扩散、毛管力渗吸是解决上述难点的关键科学问题。以室内实验和现场分析为主,在明确吉木萨尔页岩油储层微观孔隙特征、润湿性、纹层、以及渗吸驱油潜力的基础上,分析了现有闷井时间确定方法及特点,形成了吉木萨尔页岩油储层闷井时间综合确定方法。研究得出:吉木萨尔页岩油储层具有较强的渗吸扩散能力,压后闷井对原油产出起到驱替作用。闷井时间由井口压降平衡时间、渗吸平衡时间、产出液矿化度平衡时间综合确定。吉木萨尔页岩油储层压后闷井需要考虑微裂缝充液和基质渗吸协同作用,以井口压降第二转折点为下限、矿化度演化稳定上升转折点为上限、结合渗吸平衡得到最优闷井时间。基于室内实验和现场数据对Q井压后闷井时间进行了优化,推荐Q井闷井时间为55 d左右。该研究为优化吉木萨尔页岩油压后闷井时间提供了重要依据。Well shut-in after fracturing is of great importance for increasing the oil recovery and production of shale oil reservoirs. The key is to determine the shut-in time. At present,there is no systematic and effective method for determining the time of shut-in either in China or across the world. The pressure transmission of the fracture system,the ion diffusion of the produced fluid and the capillary force imbibition are the key problems to be solved for addressing the above challenges. With laboratory experiments and field analysis,a comprehensive determination method for the shut-in time for Jimsar shale oil reservoirs was developed by clarifying the microscopic pore characteristics,wettability,laminae,and imbibition flooding potential of Jimsar shale oil reservoirs and analyzing the existing methods used and characteristics of shut-in time determination. It is concluded that the Jimusar shale oil reservoir provides strong imbibition and diffusion ability,and well shut-in after fracturing contributes to the displacement of oil. The shut-in time can be determined comprehensively in accordance with the required equilibrium time of the wellhead pressure,imbibition,and production fluid salinity. To determine the post-fracturing shut-in time for Jimsar shale oil reservoirs,the synergy of micro-fracture fluid charging and matrix imbibition should be taken into consideration. Specifically,with the second turning point of wellhead pressure decline taken as the lower limit and the turning point for the stable rising of salinity as the upper limit,the optimal shut-in time is determined,considering the imbibition equilibrium. The shut-in time after fracturing for Well Q was optimized based on laboratory experiments and field data. The suggested shut-in time for Well Q is about 55 days. This study provides an important reference for optimizing the shut-in time after fracturing.
关 键 词:吉木萨尔页岩油 压裂开发 压后闷井 闷井时间 室内实验 现场分析
分 类 号:TE348[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171