检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卢靓 LU Liang(Yueyang Changling Refinery Engineering Co.,Ltd,Yueyang,Hunan 414000)
机构地区:[1]长岭炼化岳阳工程设计有限公司,湖南岳阳414000
出 处:《现代工程科技》2022年第12期94-97,共4页Modern Engineering Technology
摘 要:塔是用于气相和液相间,或液相和液相间的传质或传热过程的设备,在很多工艺环节中发挥着关键作用,是当前化工生产中至关重要的一类设备。以某项目10/4万吨/年MTBE/丁烯-1装置的催化蒸馏塔为例,分析和探讨塔的布置和塔的管道设计,以及如何运用工厂三维布置设计管理系统(PDMS)优化塔的布置和塔的管道设计。Tower is a kind of equipment used for mass or heat transfer between gas and liquid phases,or between liquid and liquid phases.It plays a key role in many process links and is a crucial type of equipment in current chemical production.This paper takes the catalytic distillation tower of a 10/40000 t/a MTBE/butene-1 unit as an example to analyze and discuss the tower layout and tower piping design,and how to use Plant Design Management system(PDMS)to optimize the tower layout and tower piping design.
分 类 号:TQ053.5[化学工程] TE65[石油与天然气工程—油气加工工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.162.18