作 者:李浩 谢胜杰 LI Hao;XIE Shengjie(BGRIMM Technology Group,Beijing 100160,China)
出 处:《中国资源综合利用》2023年第2期30-34,共5页China Resources Comprehensive Utilization
摘 要:设计采购施工(EPC)总承包模式在国际工程中的应用越来越广泛,其中质量控制对保证项目顺利交付尤为重要。施工阶段作为总承包项目的实施阶段,其完成质量决定了项目产品的最终质量。本文结合矿冶科技集团有限公司承揽的南非某冶炼EPC总承包项目,分别从人员配置、文件体系和具体执行三个方面介绍了该国际工程施工阶段的质量控制体系。The general contracting mode of engineering procurement construction(EPC)is more and more widely used in international projects,and quality control is particularly important to ensure the smooth delivery of the project.The construction stage is the implementation stage of the general contracting project,and its completion quality determines the final quality of the project products.Combined with a smelter EPC general contracting project in South Africa contracted by BGRIMM Technology Group,this paper introduces the construction phase quality control system of the international project from three aspects:personnel allocation,document system and specific implementation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117