检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:丛龙峰 Cong Longfeng(Jizhong Energy Fengfeng Group Co.,Ltd.,Handan Hebei 056004)
机构地区:[1]冀中能源峰峰集团有限公司,河北邯郸056004
出 处:《山西冶金》2022年第9期134-136,共3页Shanxi Metallurgy
摘 要:峰峰集团新三矿已进入资源枯竭期,采面多沿采空区及大巷煤柱布置,地质条件复杂,单面储量小,搬家倒面频繁。因此,以工作面切顶卸压自成巷经验为基础,制定162312工作面切顶卸压L型垂直对接连采方案,不仅多回收了煤炭资源,还实现了衔接期间产量稳定,为完成全年产量任务奠定了基础。New No.3 Coal Mine of Fengfeng Group has entered the resource depletion period.The mining faces are mostly arranged along the goaf and the main roadway pillar.The geological conditions are complex,the reserves on one side are small,and the face is moved frequently.Therefore,based on the experience of roof cutting and pressure relief in the working face,the"L"type vertical docking continuous mining scheme for roof cutting and pressure relief in the 162312 working face was developed,which not only recycled more coal resources,but also achieved stable output during the transition period,laying the foundation for completing the output task throughout the year.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229