检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钮剑武 Niu Jianwu(Lingbei Coal Mine of Fenxi Mining Group,Lingshi Shanxi 031302)
出 处:《山西冶金》2022年第9期180-181,共2页Shanxi Metallurgy
摘 要:山西某矿3506综采工作面回采的5号煤层为坚硬顶板,采面回采期间由于采空区悬空面积大、采面矿压显现剧烈等,导致采空区瓦斯涌出量较高,从而给煤炭安全回采带来威胁。为此,提出综合使用顶板弱化、漏风通道封堵、回风隅角埋管预抽等方式进行瓦斯治理,并依据采面现场实际情况对各治理技术方案进行设计。现场应用后,采面回采期间采面来压强度明显降低同时回风隅角以及回风巷内瓦斯浓度均在安全范围内,现场取得较好的应用成果。The No.5 Coal Seam mined in 3506 fully mechanized working face is a hard roof.During the mining of the mining face,due to the large suspended area of the goaf and the severe ground pressure of the mining face,the gas emission in the goaf is high,which poses a security threat to the coal mining of the mining face.Therefore,it is proposed to comprehensively use roof weakening,air leakage channel plugging,air return corner embedded pipe pre drainage and other methods for gas control,and design various control technical schemes according to the actual situation of the mining face.After field application,the pressure intensity of the mining face is significantly reduced during the mining period,and the gas concentration in the return air corner and the return air lane is within the safe range.Good application results have been achieved on the site.
分 类 号:TD712·624[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.222.110