检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:康啊真 张东明 顾宇航 金可 祝兵[1] KANG A-zhen;ZHANG Dong-ming;GU Yu-hang;JIN Ke;ZHU Bing(Department of Bridge Engineering,Southwest Jiaotong University,Chengdu 610031,China;School of Architecture and Civil Engineering,Chengdu University,Chengdu 610106,China)
机构地区:[1]西南交通大学桥梁工程系,四川成都610031 [2]成都大学建筑与土木工程学院,四川成都610106
出 处:《桥梁建设》2023年第1期33-39,共7页Bridge Construction
基 金:国家自然科学基金项目(52178167,U1834207);四川省应用基础研究项目(2021YJ0039)。
摘 要:为研究水流作用对设置沉井施工期受力特性的影响,采用线性剪切流模拟非均匀流,建立水流-圆形设置沉井相互作用模型,分析不同施工阶段圆形设置沉井与水流的相互作用情况,并与均匀流作用进行对比。结果表明:线性剪切流作用下圆形设置沉井水流力及水流力矩随流速的增加均呈平方关系。线性剪切流呈表面流速大、底层流速小的规律,对结构尾流区的涡漩有显著抑制作用,与均匀流作用相比,线性剪切流作用下结构受力偏小。随着沉井不断下沉,结构吃水深度增加,过水断面进一步压缩形成了绕流,引起局部压力及水流力成倍增加。The impact of current actions on the mechanical property of the open caisson that is directly mounted on the pre-consolidated seafloor/riverbed during construction is the focus of this study.A current-circular open caisson interaction model was developed to analyze the interaction of the circular open caisson and the currents at the construction stage,in which the non-uniform currents were simulated using the linear shear currents.The results were compared with the simulation under uniform currents.It is concluded that under the action of linear shear current,the current forces and the force moments exhibit a quadratic relationship as the current velocity rises.The linear shear currents feature greater surface velocity and smaller bottom velocity,which significantly suppress the vortexes in the wake area of the structure.Compared with the action of uniform currents,the load bearing capacity of the structure weakens under the linear shear current action.As sinking,the draught of the caisson increases,the cross-section of the passing-through currents is further compressed to be circumfluence,which causes fold increase of local pressure and current forces.
关 键 词:桥梁工程 圆形设置沉井 线性剪切流 非均匀流 水流力 流速 流场 数值模拟
分 类 号:U443.131[建筑科学—桥梁与隧道工程] U445.557[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222