中信城市广场三期B地块办公楼超高层结构设计  被引量:1

Super high-rise structural design of office building on Block B in CITIC City Plaza Phase Ⅲ

在线阅读下载全文

作  者:王静辉 周福霖[1,2,3] 谭平[1,2,3] 陈华霆 汪洋 李松森 WANG Jinghui;ZHOU Fulin;TAN Ping;CHEN Huating;WANG Yang;LI Songsen(Collaborative Innovation Center for Earthquake Mitigation and Disaster Prevention of Civil Engineering,Guangzhou University,Guangzhou 510405,China;Guangdong Provincial Key Laboratory of Earthquake Engineering and Application Technology,Guangzhou University,Guangzhou 510405,China;Key Laboratory of Engineering Anti-seismic and Structural Safety of Ministry of Education,Guangzhou University,Guangzhou 510405,China;Hong Kong Huayi Design Consultant(Shenzhen)Co.,Ltd.,Shenzhen 518057,China)

机构地区:[1]广州大学土木工程减震防灾省部共建协同创新中心,广州510405 [2]广州大学广东省地震工程与应用技术重点实验室,广州510405 [3]广州大学工程抗震减震与结构安全教育部重点实验室,广州510405 [4]香港华艺设计顾问(深圳)有限公司,深圳518057

出  处:《建筑结构》2023年第4期45-51,共7页Building Structure

基  金:国家自然科学基金项目(51978185);教育部创新团队研究发展计划项目(IRT13057);广东省教育厅创新团队项目(2016KCXTD016);广州大学研究生创新能力培养资助计划项目(2018GDJC-D06)。

摘  要:中信城市广场三期B地块办公楼主塔采用密柱框架-核心筒+环带桁架混合结构体系,针对此密柱网混合结构体系的结构特点和性能目标要求进行了抗震性能化设计并分类归纳总结,提出一系列结构加强措施。通过增设适宜刚度的环带桁架加强层从而增强外框架刚度;加强层楼板采用钢梁+钢水平撑+钢筋桁架楼承板以可靠传递加强层外框架与核心筒间的剪力;分叉斜柱角度控制在10°范围以内,采用型钢混凝土节点设计;通过设置钢框梁连接墙肢内嵌型钢暗柱形成整体墙内约束型钢边框可以进一步有效地提高底部和加强层核心筒的延性与增强组合结构整体承载能力。分析结果表明:通过各项措施后结构满足设计要求,整体性能安全可靠。The main building tower on Block B in CITIC City Plaza Phase Ⅲ adopts a hybrid structure system of dense column frame-core tube+ring belt truss.According to the structural characteristics and performance target requirements of this dense column grid hybrid structure system,the seismic performance-based design was carried out and classified.In summary,a series of structural strengthening measures were proposed.Increase the rigidity of the outer frame by adding a reinforcement layer with an appropriate rigidity ring belt truss.The reinforced floor slab adopts steel beams+steel horizontal bracing+steel truss floor deck to reliably transmit the shear force between the outer frame of the reinforced layer and the core tube.The angle of the bifurcated inclined column is controlled within the range of 10°,and the joint design of steel concrete is adopted.The steel frame beam and the inner steel column of the wall pier form a constrained steel frame inside the wall,which can improve the ductility and overall bearing capacity of the core tube at the bottom and the reinforcement layer.The analysis results show that the structure meets the design requirements after passing various measures,the overall performance is safe and reliable.

关 键 词:超高层结构 风洞试验 密柱框架-核心筒 环带桁架 抗震性能化设计 

分 类 号:TU973.23[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象