面向山地杆塔基础的新型模块化竖井掘进机设计  

Design of a New Modular Shaft Boring Machine for Mountain Tower Foundation

在线阅读下载全文

作  者:黄欣 赵昆渝 周玲 李刚 蒋强 HUANG Xin;ZHAO Kunyu;ZHOU Ling;LI Gang;JIANG Qiang(Chongqing Power Transmission and Transformation Engineering Co.,Ltd.,Chongqing,400050,China;College of Mechanical Engineering,Chongqing University of Technology,Chongqing,400050,China)

机构地区:[1]重庆市送变电工程有限公司,重庆400050 [2]重庆理工大学机械工程学院,重庆400050

出  处:《工程建设(维泽科技)》2023年第1期116-119,共4页Engineering Construction

摘  要:针对高山地区,运输装备无法到达,只能采用索道运输物资条件下的输电线路的杆塔基础施工,本论文提出一种集掘进与排渣功能的自动化模块掘进装备。论文通过深入剖析岩石破碎机理,探讨杆塔基础沉井技术工艺流程与影响因素,确定了结构设计参数与工艺参数,并采用数字化的模块设计、几何运动分析。为输电线路杆塔基础机械化施工奠定的基础。In view of the fact that the transportation equipment cannot reach the high mountain area and can only be used for the construction of the tower foundation of the transmission line under the condition of material transportation by cableway,this paper proposes an automatic modular tunneling equipment with the functions of tunneling and slag removal.Through in-depth analysis of rock breaking mechanism,this paper discusses the technical process and influencing factors of tower foundation sinking well,determines the structural design parameters and process parameters,and adopts digital module design and geometric motion analysis,which lays the foundation for the mechanized construction of transmission line tower foundation.

关 键 词:杆塔基础施工 模块化 沉井技术 

分 类 号:TD421.5[矿业工程—矿山机电]

 